To run the Assignment Progress report:
1. Select Standard Reports in the top navigation menu to open the Standard Reports page.
2. Select Assignment Progress to open the Report Configuration dialog.
3. Select the data that you want to appear on the report: assignments, student groups, or students. After you select a data set, the report filter page will open.
4. Select filtering options from the left-hand filter panel.
5. Select Apply to apply the selected filters and generate a list of matching records.
6. Select the check box next to the items that you want to appear on the report.
7. Select the Due Date Range box to open a date selection tool.
8. Specify the due date range that the report should cover.
9. Select Apply to apply the date filter.
10. Select Run Report to run the report and display the Report Summary page.
11. If you want to refine the results further:
11.1 Select Filters Applied to display a list of all fields available for the report.
11.2 Select the check box next to the fields for which you want to add a filter and enter the values that should be used for the additional filters.
11.3 Select Apply.
12. If you want to add or remove columns from the report:
12.1 Select Columns to display a list of available columns.
12.2 Select the check box next to the fields that you want to appear on the report. Clear the check box next to fields that you want to remove from the report.
13. You can drag and drop columns to reorder them.
14. You can select a column heading to sort on that column.
15. Select Export to export your report.